Primavera P6 Projects
Explore hands-on practical projects designed to give you real-world experience in Primavera P6.
Road Construction Project Master Schedule
Construction SchedulingDevelop a complete resource-loaded and cost-loaded master schedule for a 50 km highway construction project including all phases from site clearance to commissioning. Establish baseline, run CPM analysis, and produce a Gantt chart and S-curve.
Multi-Story Building Construction Programme
Building ScheduleCreate a detailed construction programme for a G+15 residential tower covering substructure, superstructure, finishes, MEP, and external works. Apply resource loading, produce weekly progress reports, and prepare earned value dashboard.
EPC Project Progress Monitoring
Earned Value MonitoringSimulate progress updates on an EPC industrial project schedule over 3 reporting periods. Calculate EV, SPI, CPI, analyze schedule slippage, identify critical path delays, and produce an executive progress report.
Schedule Delay Analysis
Delay AnalysisUsing a provided baseline and actual progress schedule, perform a delay analysis to identify the cause, duration, and responsibility of project delays. Prepare a claims-ready delay analysis narrative report.